Free · UK · CDM 2015-aligned
RAMS for HVAC engineers
Plant rooms, working at height, electrics and refrigerants — HVAC RAMS span several hazard sets.
Key hazards covered
Electric shockWorking at height (roof plant)Refrigerant handlingManual handling of units
This is a drafting aid, not a substitute for professional H&S advice. Review and adapt every RAMS to your actual site, and have a competent person approve it before work begins.
Preview
Pick a trade, fill in the job, and your RAMS appears here as a real A4 document the moment you generate it.
RAMS for HVAC engineers: common questions
- What should an HVAC RAMS cover?
- Electrical isolation, working at height on roof-mounted plant, refrigerant handling (F-Gas), and manual handling of heavy units. Combine the electrical hazards with height and add refrigerant-specific controls.
- Does it cover refrigerants?
- Refrigerant handling needs F-Gas certification and specific controls (leak detection, ventilation) that sit alongside the RAMS. The template covers the electrical and height risks; add the refrigerant assessment.
- Is this RAMS generator free?
- Yes — you can create RAMS documents on the free plan with a small footer credit. Upgrading removes the footer, unlocks the full hazard library and your branding, and saves your hazard libraries so the next one takes minutes.
- Does this guarantee I'm compliant?
- No — and be wary of any tool that claims it does. It gives you a professional, well-structured starting point built from common trade hazards. You must review and adapt every RAMS to your actual site, and a competent person must approve it before work begins.
- Will a principal contractor accept it?
- The document follows the standard RAMS structure principal contractors expect — scope, risk assessment with a 5×5 matrix, method statement, PPE, emergency arrangements and an operative sign-off sheet. As with any RAMS, the contractor reviews and approves it against their site.
RAMS for other trades
Or start from the main RAMS generator and pick any trade.
This generator produces a drafting aid, not professional health & safety advice, and does not itself guarantee compliance. Every RAMS must be reviewed, adapted to site-specific conditions and approved by a competent person before work begins.