Free · UK · CDM 2015-aligned
RAMS for solar panel installers
Roof work plus live DC electrics — solar RAMS combine the two highest-risk areas in one job.
Key hazards covered
Falls from roofsElectric shock (DC/live PV)Manual handling of panelsFragile surfaces
This is a drafting aid, not a substitute for professional H&S advice. Review and adapt every RAMS to your actual site, and have a competent person approve it before work begins.
Preview
Pick a trade, fill in the job, and your RAMS appears here as a real A4 document the moment you generate it.
RAMS for solar panel installers: common questions
- What hazards should a solar installation RAMS cover?
- Working at height on roofs (edge protection, fragile surfaces), electric shock from live PV and DC circuits (which can't be fully isolated in daylight), manual handling of panels, and dropped objects. Combine the electrical and construction hazards.
- Why is PV electrical risk different?
- PV panels generate DC voltage whenever there's light, so they can't be made fully dead like a mains circuit. The RAMS should reflect working on partially-live systems — add this to the electrical controls before briefing.
- Is this RAMS generator free?
- Yes — you can create RAMS documents on the free plan with a small footer credit. Upgrading removes the footer, unlocks the full hazard library and your branding, and saves your hazard libraries so the next one takes minutes.
- Does this guarantee I'm compliant?
- No — and be wary of any tool that claims it does. It gives you a professional, well-structured starting point built from common trade hazards. You must review and adapt every RAMS to your actual site, and a competent person must approve it before work begins.
- Will a principal contractor accept it?
- The document follows the standard RAMS structure principal contractors expect — scope, risk assessment with a 5×5 matrix, method statement, PPE, emergency arrangements and an operative sign-off sheet. As with any RAMS, the contractor reviews and approves it against their site.
RAMS for other trades
Or start from the main RAMS generator and pick any trade.
This generator produces a drafting aid, not professional health & safety advice, and does not itself guarantee compliance. Every RAMS must be reviewed, adapted to site-specific conditions and approved by a competent person before work begins.