RAMS for groundworkers

Excavations, buried services and heavy plant — groundworks RAMS carry the highest-consequence hazards.

Key hazards covered

Excavation collapseStriking buried servicesContact with plantManual handling
Start with your trade

Pick the closest trade to pre-fill hazards, controls, PPE and method steps — then edit everything to your actual job.

Contractor
Project / site
Scope of works
Personnel
PPE required
Risk assessment
9 Medium
4 Low
Method statement
1.

This is a drafting aid, not a substitute for professional H&S advice. Review and adapt every RAMS to your actual site, and have a competent person approve it before work begins.

Preview
Pick a trade, fill in the job, and your RAMS appears here as a real A4 document the moment you generate it.

RAMS for groundworkers: common questions

What should a groundworks RAMS cover?
Excavation collapse (support, battering, exclusion), striking buried services (scan, CAT and Genny, safe digging), contact with moving plant (segregation, banksman), and manual handling. Start from construction and add excavation-specific controls.
Does it cover buried services and excavation support?
The construction base covers plant and general controls; excavation collapse and buried services need site-specific detail (service drawings, trench support design). Add these — they're the highest-consequence risks on the job.
Is this RAMS generator free?
Yes — you can create RAMS documents on the free plan with a small footer credit. Upgrading removes the footer, unlocks the full hazard library and your branding, and saves your hazard libraries so the next one takes minutes.
Does this guarantee I'm compliant?
No — and be wary of any tool that claims it does. It gives you a professional, well-structured starting point built from common trade hazards. You must review and adapt every RAMS to your actual site, and a competent person must approve it before work begins.
Will a principal contractor accept it?
The document follows the standard RAMS structure principal contractors expect — scope, risk assessment with a 5×5 matrix, method statement, PPE, emergency arrangements and an operative sign-off sheet. As with any RAMS, the contractor reviews and approves it against their site.

RAMS for other trades

Or start from the main RAMS generator and pick any trade.

This generator produces a drafting aid, not professional health & safety advice, and does not itself guarantee compliance. Every RAMS must be reviewed, adapted to site-specific conditions and approved by a competent person before work begins.